In the 60.000 m2 industrial construction project, roof trusses with axle span of 18 meters and facade construction works with a height of 12 meters were made. The purlins are formed by 23 meter long triangular mesh pipe profiles and produced in one piece and assembled.
Approximately 750 tons of roof and 300 tons of facade constructions have been completed in 50 days.