METEK

Airport Ghana Kotoka

In the airport project, which has a construction area of ​​48.000m2, approximately 900 tons of structural steel construction manufacturing works were performed. In addition, the cambered bearing elements of the canopies are made of built-up sheet metal by special bending methods.